IGLC 24 · Boston, Massachusetts, USA · 2016
Towards a Model for Planning and Controlling ETO Design Projects
- Professor, Dr.Ing, School of Business and Law, Department of working life and innovation, University of Agder, 4846 Grimstad, Norway, Mobile +4797082582, e-mail: bo.t.kalsaas@uia.no
- Research Assistant, M.Sc. School of Business and Law, Department of working life and innovation, University of Agder, 4846 Grimstad, Norway, e-mail: knut.e.bonnier@uia.no
- Research Assistant, M.Sc. School of Business and Law, Department of working life and innovation, University of Agder, 4846 Grimstad, Norway, e-mail: arne.ose@uia.no
Abstract
In the modern engineering environment design projects have become increasingly complex; this calls for an updated perspective on how to plan and coordinate design projects. This paper describes the identified premise that will lay the foundation of the development of a model for planning and controlling such projects. The premise includes principles, requirements, and methods derived from theories around subjects, such as, production theory, lean and agile. The distinctiveness of the design process has been central when setting the premise for the model.
Keywords
- Design
- coordination
- control
- complexity
- ETO
- maturity levels
- Agile
- LPS
Cite this paper
APA 7th edition
Kalsaas, B. T., Bonnier, K. E., & Ose, A. O. (2016). Towards a Model for Planning and Controlling ETO Design Projects. In 24th Annual Conference of the International Group for Lean Construction.
Shortened reference for IGLC papers
Kalsaas, B. T., Bonnier, K. E., & Ose, A. O. (2016). Towards a Model for Planning and Controlling ETO Design Projects. IGLC24.