2025
What Types of Problem-Solving are Used in the Last Planner System?Trond Bølviken, John Skaar, Bo Terje Kalsaas and Lauri Koskela · IGLC 33, 2025 · PDF
-
2025
Revitalizing Language Action in the Last Planner System™John Skaar, Trond Bølviken and Bo Terje Kalsaas · IGLC 33, 2025 · PDF
-
2023
What Does a Commitment to a Plan Mean?John Skaar, Trond Bølviken, Bo Terje Kalsaas and Lauri Koskela · IGLC 31, 2023 · PDF
-
2022
The Dual Nature of Complexity in Construction Management–Call for a Renewed DebateBo Terje Kalsaas, Trond Bølviken and John Skaar · IGLC 30, 2022 · PDF
- 2021
- 2021
- 2021
- 2020
- 2020
-
2018
Transformation From Design-Bid-Build to Design-Build Contracts in Road ConstructionBo Terje Kalsaas, Gøril Hannås, Grethe Frislie and John Skaar · IGLC 26, 2018 · PDF
-
2018
New Approach to Developing Integrated Milestones for Planning and Production ControlBo Terje Kalsaas and Kai Haakon Kristensen · IGLC 26, 2018 · PDF
-
2017
A Balanced Dashboard for Production Planning and Control.Trond Bølviken, Sigmund Aslesen, Bo Terje Kalsaas and Lauri Koskela · IGLC 25, 2017 · PDF
-
2016
Towards a Model for Planning and Controlling ETO Design ProjectsBo Terje Kalsaas, Knut E. Bonnier and Arne O. Ose · IGLC 24, 2016 · PDF
-
2015
Pull vs. Push in Construction Work Informed by Last PlannerBo Terje Kalsaas, John Skaar and Rein Terje Thorstensen · IGLC 23, 2015 · PDF
-
2015
Waste in Design and EngineeringKnut Erik Bonnier, Bo Terje Kalsaas and Arne Olai Ose · IGLC 23, 2015 · PDF
-
2014
Increase Predictability in Complex Engineering and Fabrication ProjectsKnut Anders Lia, Henning Ringerike and Bo Terje Kalsaas · IGLC 22, 2014 · PDF
-
2014
To Achieve Predictability in EngineeringBo Terje Kalsaas, Stian Finsådal and Kristian Hasle · IGLC 22, 2014 · PDF
-
2014
Integrated Planning vs. Last Planner SystemBo Terje Kalsaas, Ingvald Grindheim and Nina Læknes · IGLC 22, 2014 · PDF
-
2014
Construction Site Operations Made Leaner and Standardized: A Case StudyRoar Fosse, Bo Terje Kalsaas and Frode Drevland · IGLC 22, 2014 · PDF
-
2014
To Measure Workflow and Waste. A Concept for Continuous ImprovementBo Terje Kalsaas, Mariann Gundersen and Truls Olav Berge · IGLC 22, 2014 · PDF
-
2013
Measuring Waste and Workflow in ConstructionBo Terje Kalsaas · IGLC 21, 2013 · PDF
-
2013
Improving Buildabuility With Platforms and ConfiguratorsBo Terje Kalsaas · IGLC 21, 2013 · PDF
-
2013
Last Planner System Innovation Efforts on Requirements for Digital Management SystemRein Terje Thorstensen, Bo Terje Kalsaas, John Skaar and Sigmund Jensen · IGLC 21, 2013 · PDF
-
2012
Further Work on Measuring Workflow in Construction Site ProductionBo Terje Kalsaas · IGLC 20, 2012 · PDF
-
2012
Waste in Construction: a Systematic Literature Review on Empirical StudiesDaniela Dietz Viana, Carlos Torres Formoso and Bo Terje Kalsaas · IGLC 20, 2012 · PDF
-
2011
On the Discourse of Measuring Work Flow Efficiency in Construction. A Detailed Work Sampling MethodBo Terje Kalsaas · IGLC 19, 2011 · PDF
-
2011
Conceptualization of Interdependency and Coordination Between Construction TasksBo Terje Kalsaas and Rafael Sacks · IGLC 19, 2011 · PDF
-
2011
Discussion of Strategies for Measuring Workflow in ConstructionTrond Bølviken and Bo Terje Kalsaas · IGLC 19, 2011 · PDF
-
2011
Integrated Inward Logistics and Construction Work and its Impact on Efficency in ProductionBo Terje Kalsaas, Rein Terje Thorstensen, Andreas Grepperud, Halvard Hinlo, Sigmund Jensen and John Skaar · IGLC 19, 2011 · PDF
-
2010
The Flow of Work in Construction: A Conceptual DiscussionBo Terje Kalsaas and Trond Bolviken · IGLC 18, 2010 · PDF
-
2010
Work-Time Waste in ConstructionBo Terje Kalsaas · IGLC 18, 2010 · PDF
-
2009
Implementation of Last Planner in a Medium-Sized Construction SiteBo Terje Kalsaas, John Skaar and Rein Terje Thorstensen · IGLC 17, 2009 · PDF