Logistics Planning Within the Last Planner System for Highway Construction Projects
- M.Sc. Candidate in Civil Eng. at Federal University of Rio Grande do Sul, Lean Consultant at Climb Consulting Group, Porto Alegre, Brazil. bruno@climbgroup.com.br, orcid.org/0000-0003-4437-4664
- Lean Consultant at Climb Consulting Group, Graduate in Civil Eng. at Pucrs, Porto Alegre, Brazil. fernanda@climbgroup.com.br, orcid.org/0000-0003-0230-4326
- PhD Candidate, M.Sc. Eng., Founding-Partner at Climb Consulting Group, Federal University of Rio Grande do Sul, Porto Alegre, Brazil, marcus@climbgroup.com.br , orcid.org/0000-0001-5843-4715
- PhD Candidate, M.Sc. Eng., Founding-Partner at Climb Consulting Group, Federal University of Rio Grande do Sul, Porto Alegre, Brazil, bernardo@climbgroup.com.br , orcid.org/0000-0002-3037- 5597
- Director Eng. at Neovia Engenharia, Curitiba, Paraná, Brazil frederico.campos@neoviaengenharia.com.br , orcid.org/0000-0002-5745-7461
- lanning Manager at Neovia Engenharia, Curitiba, Paraná, Brazil joao.junior@neoviaengenharia.com.br , orcid.org/0000-0001-5289-0963
- Planning Eng. at Neovia Engenharia, Curitiba, Paraná, Brazil barbara.kronbauer@neoviaengenharia.com.br , orcid.org/0000-0003-1370-7331
https://doi.org/10.24928/2023/0191
Abstract
This study presents a new Logistics Planning methodology implemented in a highway construction project from May to December 2022. The objective was to analyze the feasibility of using a Logistics Planning method with the help of a Visual Board, in conjunction with the Last Planner System. The research method utilized was the Design Science Research. A 6-step method was developed to enhance the Lookahead Planning routine. After the implementation of the methodology, a decrease in the total and equipment-related impact hours in the productivity fronts was observed, as well as an improvement in the PPC indicator and labour productivity in each service front. It was concluded that the use of Visual Management, combined with Logistics Planning, stimulates the engagement of the operation's employees around the project schedule, increasing the accuracy of the Master Plan.
Keywords
- Lean construction Highways
- Last Planner System
- Visual Management
- Lookahead Planning
- Logistics Planning.
Cite this paper
APA 7th edition
Antonini, B. G., Pimentel, F. M., Fireman, M. C. T., Etges, B. M. B. S., Campos, F. R., Junior, J. L., & Kronbauer, B. K. (2023). Logistics Planning Within the Last Planner System for Highway Construction Projects. In Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) (pp. 1291–1302). https://doi.org/10.24928/2023/0191
Shortened reference for IGLC papers
Antonini, B. G., Pimentel, F. M., Fireman, M. C. T., Etges, B. M. B. S., Campos, F. R., Junior, J. L., & Kronbauer, B. K. (2023). Logistics Planning Within the Last Planner System for Highway Construction Projects. IGLC31. https://doi.org/10.24928/2023/0191