Influence of Integrated Teams and Co-Location to Achieve the Target Cost in Building Projects

  1. Integration, Process, Transformation-Flow-Value, Target Cost, Integrated Project Delivery (IPD)

https://doi.org/10.24928/2020/0109

Abstract

Construction projects are complex that the creation of value cannot only be carried out by a company; for this reason, temporary contracts are created between construction companies, designers, and owners. However, these contractual relationships are difficult when the interests and needs of each company are contrasted with those of the project and generate problems of collaboration between the parties. The present study describes the implementation of project integration practices such as co-location and integrated teams in a building project in Lima, Peru. The ideas proposed resulted in savings for the project. The study details the ideas by discipline and the achievements obtained.

Keywords

  • Integration
  • Process
  • Transformation-Flow-Value
  • Target Cost
  • Integrated Project Delivery (IPD)

Cite this paper

APA 7th edition

Lazarte, F. M. G. (2020). Influence of Integrated Teams and Co-Location to Achieve the Target Cost in Building Projects. In Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC) (pp. 733–744). https://doi.org/10.24928/2020/0109

Shortened reference for IGLC papers

Lazarte, F. M. G. (2020). Influence of Integrated Teams and Co-Location to Achieve the Target Cost in Building Projects. IGLC28. https://doi.org/10.24928/2020/0109