IGLC 25 · Heraklion, Greece · 2017
Standardized Work: Practical Examples in a Brazilian Construction Company
- Civil Engineer, Lean & Green Coordinator of C. Rolim Engenharia Ltda., Brazil, angela@crolim.com.br
- Undergraduate Student of Civil Engineering, Intern of C. Rolim Engenharia Ltda., Brazil, taynah@crolim.com.br
- Civil Engineer, Technical Manager of C. Rolim Engenharia Ltda., Brazil, felipe@crolim.com.br
- Civil Engineer, Technical Director of C. Rolim Engenharia Ltda., Brazil, alexandre@crolim.com.br
https://doi.org/10.24928/2017/0128
Keywords
- Lean construction
- standardization
- production
- job-sequencing
- continuous improvement
Cite this paper
APA 7th edition
Saggin, A. B., Mota, T. R., Brito, F. L., & Mourão, C. A. M. A. (2017). Standardized Work: Practical Examples in a Brazilian Construction Company. In 25th Annual Conference of the International Group for Lean Construction (pp. 713–720). https://doi.org/10.24928/2017/0128
Shortened reference for IGLC papers
Saggin, A. B., Mota, T. R., Brito, F. L., & Mourão, C. A. M. A. (2017). Standardized Work: Practical Examples in a Brazilian Construction Company. IGLC25. https://doi.org/10.24928/2017/0128