IGLC 25 · Heraklion, Greece · 2017

Standardized Work: Practical Examples in a Brazilian Construction Company

  1. Civil Engineer, Lean & Green Coordinator of C. Rolim Engenharia Ltda., Brazil, angela@crolim.com.br
  2. Undergraduate Student of Civil Engineering, Intern of C. Rolim Engenharia Ltda., Brazil, taynah@crolim.com.br
  3. Civil Engineer, Technical Manager of C. Rolim Engenharia Ltda., Brazil, felipe@crolim.com.br
  4. Civil Engineer, Technical Director of C. Rolim Engenharia Ltda., Brazil, alexandre@crolim.com.br

https://doi.org/10.24928/2017/0128

Keywords

  • Lean construction
  • standardization
  • production
  • job-sequencing
  • continuous improvement

Cite this paper

APA 7th edition

Saggin, A. B., Mota, T. R., Brito, F. L., & Mourão, C. A. M. A. (2017). Standardized Work: Practical Examples in a Brazilian Construction Company. In 25th Annual Conference of the International Group for Lean Construction (pp. 713–720). https://doi.org/10.24928/2017/0128

Shortened reference for IGLC papers

Saggin, A. B., Mota, T. R., Brito, F. L., & Mourão, C. A. M. A. (2017). Standardized Work: Practical Examples in a Brazilian Construction Company. IGLC25. https://doi.org/10.24928/2017/0128