IGLC 25 · Heraklion, Greece · 2017

Off-Site Guarding: Look-Ahead Supply Scheduling for Risk Indication With BIM

  1. Ph.D. Candidate, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, ningshuang.zeng@rub.de
  2. Professor, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, koenig@inf.bi.rub.de
  3. Senior Lecturer and Researcher, Faculty of Civil and Environmental Engineering, Ruhr-University Bochum, Bochum, Germany, jochen.teizer@rub.de

https://doi.org/10.24928/2017/0172

Abstract

Modern Information and Communication Technology (ICT) make it possible to re-organize the information flow and enhance the physical flow of the Construction Supply Chain (CSC). Considering the resource status and potential risks that exist in the CSC, this paper first explores the current CSC re-organization caused by the application of Building Information Modelling (BIM) and related beneficial conditions created by ICT. It then tackles the problem of controlling risk effectively by off-site guarding the upstream of the CSC. Based on the selected approach, the concept and basic mode of a look-ahead supply schedule is proposed. Finally, results to a use case demonstrate the applica

Keywords

  • Look-ahead schedule
  • CSC
  • ICT
  • BIM
  • off-site guarding.

Cite this paper

APA 7th edition

Zeng, N., König, M., & Teizer, J. (2017). Off-Site Guarding: Look-Ahead Supply Scheduling for Risk Indication With BIM. In 25th Annual Conference of the International Group for Lean Construction (pp. 877–884). https://doi.org/10.24928/2017/0172

Shortened reference for IGLC papers

Zeng, N., König, M., & Teizer, J. (2017). Off-Site Guarding: Look-Ahead Supply Scheduling for Risk Indication With BIM. IGLC25. https://doi.org/10.24928/2017/0172