Hisham Abou-Ibrahim
9 papers at 5 conferences, 2015–2025.
ORCID 0000-0003-4261-9322
Also published as Hisham Abou Ibrahim, Hisham A. Abou Ibrahim, Hisham Abou Ibrahim.
-
2025
Daily Batch Size of Design – Proposal for the Sizing of Design BatchesEelon Lappalainen, Hisham Abou-Ibrahim, Jyrki Oraskari, Olli Seppänen, Umer Majid and Markus Derry · IGLC 33, 2025 · PDF
-
2022
Effects of Daily Management on Design ReliabilityEelon Lappalainen, Petri Uusitalo, Hisham Abou-Ibrahim, Olli Seppänen, Aku Hänninen and Kristian Söderström. · IGLC 30, 2022 · PDF
-
2022
Findings on the Use of the Last Planner System—a Case StudyEelon Lappalainen, Hisham Abou Ibrahim, Olli Seppänen and Ilari Palsola · IGLC 30, 2022 · PDF
-
2022
Uncovering and Visualizing Work Process Interruptions Through Quantitative Workflow AnalysisChristopher Görsch, Alaa Al Barazi, Olli Seppänen and Hisham Abou Ibrahim · IGLC 30, 2022 · PDF
-
2022
Mechanical, Electrical and Plumbing Coordination Practices: Case Finnish Construction MarketKrishna Chauhan, Antti Peltokorpi, Hisham Abou-Ibrahim and Olli Seppänen · IGLC 30, 2022 · PDF
-
2022
Digital Twin of a Design Process: An Exploratory StudyHisham Abou-Ibrahim, Eelon Lappalainen and Olli Seppänen · IGLC 30, 2022 · PDF
-
2017
Design Management: Metrics and Visual ToolsHisham Abou-Ibrahim and Farook Hamzeh · IGLC 25, 2017 · PDF
-
2016
BIM: A TFV Perspective to Manage Design Using the LOD ConceptHisham Abou-Ibrahim and Farook Hamzeh · IGLC 24, 2016 · PDF
-
2015
Expected Lean Effects of Advanced High-Rise Formwork SystemsHisham A. Abou Ibrahim and Farook R. Hamzeh · IGLC 23, 2015 · PDF