Authors

Ariovaldo Denis Granja

20 papers at 12 conferences, 2004–2024.

ORCID 0000-0002-2964-5609

Also published as Ariovaldo D. Granja.

  1. 2024
    Insertion of Modular Construction Aligned With Lean Principles: A Conceptual Map Model
    Marcos Henrique Bueno da Silva, Elisa Atália Daniel Muianga, Kaio Pimentel Rego de Oliveira and Ariovaldo Denis Granja · IGLC 32, 2024 · PDF
  2. 2021
    Living Labs in a Lean Perspective
    Joao Soliman-Junior, Samira Awwal, Marcelle Engler Bridi, Patricia Tzortzopoulos, Ariovaldo Denis Granja, Lauri Koskela and Danilo Gomes · IGLC 29, 2021 · PDF · Slides
  3. 2021
    Strengthening Target Value Design Benefits in Real Estate Market Through Living Labs
    Carolina A. Oliva, Ariovaldo D. Granja, Marcelle E. Bridi, João Soliman-Junior, Moralake Ayo-Adejuyigbe and Patricia Tzortzopoulos · IGLC 29, 2021 · PDF
  4. 2019
    Modularity in the Construction Industry: A Systematic Mapping Study
    Marcelle Engler Bridi, Eliká Deboni Ceolin, Ariovaldo Denis Granja and Carlos Torres Formoso · IGLC 27, 2019 · PDF · Slides
  5. 2019
    Target Value Design in Real Estate Market: A Conceptual Map Model
    Carolina Asensio Oliva and Ariovaldo Denis Granja · IGLC 27, 2019 · PDF
  6. 2016
    Assessing Suitability of Target Value Design Adoption for Real Estate Developers in Brazil
    Carolina Asensio Oliva, Ariovaldo Denis Granja, Glenn Ballard and Reymard Savio de Melo · IGLC 24, 2016 · PDF
  7. 2016
    Integrating Lbms, Lps and Cpm: A Practical Process
    Hylton Olivieri, Olli Seppänen and Ariovaldo D. Granja · IGLC 24, 2016 · PDF
  8. 2014
    Target Costing in Construction: A Comparative Study
    Reymard Melo, Amit Kaushik, Lauri Koskela, Ariovaldo Denis Granja, Kaushal Keraminiyage and Patricia Tzortzopoulos · IGLC 22, 2014 · PDF
  9. 2013
    Collaboration to Extend Target Costing to Non-Multi-Party Contracted Projects: Evidence From Literature
    Reymard Savio Sampaio de Melo, Ariovaldo Denis Granja and Glenn Ballard · IGLC 21, 2013 · PDF
  10. 2013
  11. 2012
    A Review of the Standardized Work Application in Construction
    Renato Nunes Mariz, Flávio Augusto Picchi, Ariovaldo Denis Granja and Reymard Savio Sampaio de Melo · IGLC 20, 2012 · PDF
  12. 2012
    Interorganizational Cost Management and its Implications for Target Costing in Construction
    Reymard Savio Sampaio de Melo and Ariovaldo Denis Granja · IGLC 20, 2012 · PDF
  13. 2011
    Broader Implementations of Production Cells in Construction Considering Time, Space and Information Linkages
    Renato N. Mariz, Flavio A. Picchi, Ariovaldo D. Granja and Reymard S. S. Melo · IGLC 19, 2011 · PDF
  14. 2011
    An Investigation Into the Systematic Use of Value Engineering in the Product Development Process
    Joyce de Andrade Ruiz, Ariovaldo Denis Granja, Flávio Augusto Picchi and Reymard Sávio Sampaio de Melo · IGLC 19, 2011 · PDF
  15. 2008
    Target Costing Research Analysis: Reflections for Construction Industry Implementation
    Ana Mitsuko Jacomit, Ariovaldo Denis Granja and Flavio Augusto Picchi · IGLC 16, 2008 · PDF
  16. 2006
    Target and Kaizen Costing Implementation in Construction
    Gabriel R. T. Robert and Ariovaldo Denis Granja · IGLC 14, 2006 · PDF
  17. 2006
    Stabilization and Standardization of a Precast Production Process
    Carlos Antonio Samaniego Gallardo, Ariovaldo Denis Granja, Flavio Augusto Picchi and Alex Tort Folch · IGLC 14, 2006 · PDF
  18. 2005
    Combining Value Stream and Process Levels Analysis for Continuous Flow Implementation in Construction
    Iamara Rossi Bulhões, Flavio Augusto Picchi and Ariovaldo Denis Granja · IGLC 13, 2005 · PDF
  19. 2005
    Target and Kaizen Costing in Construction
    Ariovaldo Denis Granja, Flavio Augusto Picchi and Gabriel Torrano Robert · IGLC 13, 2005 · PDF
  20. 2004
    Construction Sites: Using Lean Principles to Seek Broader Implementations
    Flavio Augusto Picchi and Ariovaldo Denis Granja · IGLC 12, 2004 · PDF