Glenn Ballard
116 papers at 29 conferences, 1996–2025.
ORCID 0000-0002-0948-8861
Also published as G. Ballard, H. Glenn Ballard.
-
2025
Reliable Delivery Order for Improving Workflow in the Construction Supply ChainYong-Woo Kim and Glenn Ballard · IGLC 33, 2025 · PDF
-
2025
Lean Construction for the Sake of What?Randi M. Christensen, Paz Arroyo, Annett Schöttle and Glenn Ballard · IGLC 33, 2025 · PDF
-
2024
An Exploration of Psychological Safety and Team Behaviors in a Construction Global TeamSulyn Gomez Villanueva, Glenn Ballard, Stephen Terni, Paz Arroyo and Kevin Bello · IGLC 32, 2024 · PDF
-
2023
Waste: Why Economics Got Is So Wrong, and What Could Be the Remedy?Lauri Koskela, Glenn Ballard and Trond Bølviken · IGLC 31, 2023 · PDF
-
2023
Features of a Behavior-Based Quality System (BBQS)Sulyn Gomez, Semich Chousein, Iris D. Tommelein, Glenn Ballard, Ralph Romayor, Michelle Diaz, Paz Arroyo and Safak Tekin · IGLC 31, 2023 · PDF
- 2021
- 2020
-
2019
Changing Behaviors Upstream to Achieve Expected OutcomesSulyn Gomez, Raymond Huynh, Paz Arroyo, Glenn Ballard, Iris Tommelein and Patricia Tillmann · IGLC 27, 2019 · PDF
- 2019
- 2019
-
2018
A Comparison of Competitive Dialogue and Best Value ProcurementPaulos Abebe Wondimu, Ole Jonny Klakegg, Ola Lædre and Glenn Ballard · IGLC 26, 2018 · PDF
-
2018
Believing Is Seeing: Paradigms as a Focal Point in the Lean DiscourseSamuel Korb and H. Glenn Ballard · IGLC 26, 2018 · PDF
-
2018
Indicators for Observing Elements of Linguistic Action Perspective in Last Planner® SystemLuis A. Salazar, Glenn Ballard, Paz Arroyo and Luis F. Alarcón · IGLC 26, 2018 · PDF
-
2018
Integrated Project Delivery for Infrastructure Projects in PeruSulyn Gomez, Glenn Ballard, Nader Naderpajouh and Santiago Ruiz · IGLC 26, 2018 · PDF
-
2018
Designing as a Court of LawLauri Koskela, Paz Arroyo and Glenn Ballard · IGLC 26, 2018 · PDF
-
2017
How Research Can Help Transform the Construction IndustryFritz Gehbauer, Glenn Ballard and Margarita Leonova · IGLC 25, 2017 · PDF
-
2017
Strategies That Can Help Transform the Construction IndustryMargarita Leonova, Glenn Ballard and Fritz Gehbauer · IGLC 25, 2017 · PDF
-
2017
An Exploration of Compatibility of U.S. Army Culture and Lean ConstructionRalph T. Salazar, Zofia K. Rybkowski and Glenn Ballard · IGLC 25, 2017 · PDF
-
2017
Virtual Design and Construction: Aligning BIM and Lean in PracticeRoar Fosse, Glenn Ballard and Martin Fischer · IGLC 25, 2017 · PDF
-
2017
A Case Study on the Success Factors of Target Value DesignPatricia A. Tillmann, Doanh Do and Glenn Ballard · IGLC 25, 2017 · PDF
-
2017
Project Flexibility and Lean ConstructionGlenn Ballard and Hajnalka Vaagen · IGLC 25, 2017 · PDF
-
2017
Why Lean Projects Are SaferGregory Howell, Glenn Ballard and Sevilay Demirkesen · IGLC 25, 2017 · PDF
-
2016
Assessing Suitability of Target Value Design Adoption for Real Estate Developers in BrazilCarolina Asensio Oliva, Ariovaldo Denis Granja, Glenn Ballard and Reymard Savio de Melo · IGLC 24, 2016 · PDF
-
2016
Collaboration in Design – Justification, Characteristics and Related ConceptsErgo Pikas, Lauri Koskela, Niels Treldal, Glenn Ballard and Roode Liias · IGLC 24, 2016 · PDF
-
2016
Filmmaking and Construction: Two Project Production SystemsGlenn Ballard, Christin Egebjerg, Trond Bølviken, Sigve Endresen and Brittany Ballard · IGLC 24, 2016 · PDF
-
2016
Lean Design Management in Practice With the Last Planner SystemRoar Fosse and Glenn Ballard · IGLC 24, 2016 · PDF
-
2015
Formwork Standardization and Production Flow: Lessons From an Affordable Housing Project in EcuadorEder H. Martinez, Ariana M. Alvear, Iris D. Tommelein and Glenn Ballard · IGLC 23, 2015 · PDF
-
2015
Integration of Last Planner System and Location-Based Management SystemOlli Seppänen, Ralf-Uwe Modrich and Glenn Ballard · IGLC 23, 2015 · PDF
-
2015
How to Make Shared Risk and Reward SustainableGlenn Ballard, Blake Dilsworth, Doanh Do, Wayne Low, James Mobley, Philip Phillips, Dean Reed, Zach Sargent, Patricia Tillmann and Nathan Wood · IGLC 23, 2015 · PDF
-
2015
An Analysis of Potential Misalignments of Commercial Incentives in Integrated Project Delivery and Target Value DesignDoanh Do, Glenn Ballard and Iris D. Tommelein · IGLC 23, 2015 · PDF
-
2014
Target Value Design as a Method for Controlling Project Cost OverrunsDoanh Do, Chao Chen, Glenn Ballard and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
Developing a Production System on IPD: Considerations for a Pluralistic EnvironmentPatricia Tillmann, Klas Berghede, Glenn Ballard and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
Choosing By Advantages and Rhetoric in Building Design: Relationship and Potential SynergiesPaz Arroyo, Glenn Ballard and Iris D. Tommelein · IGLC 22, 2014 · PDF
-
2014
Comparing Weighting Rating and Calculating vs. Choosing by Advantages to Make Design ChoicesPaz Arroyo, Iris D. Tommelein and Glenn Ballard · IGLC 22, 2014 · PDF
-
2014
A Mentoring Approach to Implement Lean ConstructionPatricia Tillmann, Glenn Ballard and Iris Tommelein · IGLC 22, 2014 · PDF
-
2014
Are Tools and Training Enough - An Argument for LeadershipJuho-Pekka Hämäläinen, Glenn Ballard and Jan Elfving · IGLC 22, 2014 · PDF
-
2013
In Search of Lean Suppliers Reporting on First Steps in Supplier DevelopmentJan A. Elfving and Glenn Ballard · IGLC 21, 2013 · PDF
-
2013
Conceptual Estimating and Target CostingGlenn Ballard and Ari Pennanen · IGLC 21, 2013 · PDF
-
2013
Collaboration to Extend Target Costing to Non-Multi-Party Contracted Projects: Evidence From LiteratureReymard Savio Sampaio de Melo, Ariovaldo Denis Granja and Glenn Ballard · IGLC 21, 2013 · PDF
-
2013
Using 'Choosing by Advantages' to Select Tile From a Global Sustainable PerspectivePaz Arroyo, Iris D. Tommelein and Glenn Ballard · IGLC 21, 2013 · PDF
-
2013
Contributions of Existing Practices to Pursuing Value in Construction ProjectsPatricia Tillmann, Patricia Tzortzopoulos, Carlos T. Formoso and Glenn Ballard · IGLC 21, 2013 · PDF
-
2013
An Experiment in Takt Time Planning Applied to Non-Repetitive WorkMeeli Linnik, Klas Berghede and Glenn Ballard · IGLC 21, 2013 · PDF
-
2012
Deciding a Sustainable Alternative by Choosing by Advantages' in the AEC industryPaz Arroyo, Iris D. Tommelein and Glenn Ballard · IGLC 20, 2012 · PDF
-
2012
Should Project Budgets Be Based on Worth or Cost?Glenn Ballard · IGLC 20, 2012 · PDF
-
2012
How Integrated Governance Contributes to Value Generation – Insights From an IPD Case StudyPatricia Tillmann, Glenn Ballard, Patricia Tzortzopolous and Carlos Formoso · IGLC 20, 2012 · PDF
-
2011
A Response to Critics of Lean ConstructionGlenn Ballard and Lauri Koskela · IGLC 19, 2011 · PDF
-
2011
In Search of Lean Suppliers - Structuring a Preferred Supplier ProgramJan A. Elfving and Glenn Ballard · IGLC 19, 2011 · PDF
-
2010
Lean Design Management in an Infrastructure Design-Build Project: A Case StudyHyun Woo Lee, Iris D. Tommelein and Glenn Ballard · IGLC 18, 2010 · PDF
-
2010
Designing to Targets in a Target Costing ProcessAri Pennanen, Glenn Ballard and Yrjänä Haahtela · IGLC 18, 2010 · PDF
-
2010
Standardizing Logistics at the Corporate Level Towards Lean Logistics in ConstructionJan A. Elfving, Glenn Ballard and Ulla Talvitie · IGLC 18, 2010 · PDF
-
2010
Accident Rate Down From 57 to 9 in Five YearsAntti Leino, Jan Elfving and Glenn Ballard · IGLC 18, 2010 · PDF
-
2010
Building an Argument With Hypothesis TestingSeongKyun Cho and Glenn Ballard · IGLC 18, 2010 · PDF
-
2010
The Combination of Last Planner System and Location-Based Management SystemOlli Seppanen, Glenn Ballard and Sakari Pesonen · IGLC 18, 2010 · PDF
-
2009
Is the Last Planner System Applicable to Design? A Case StudyFarook R. Hamzeh, Glenn Ballard and Iris D Tommelein · IGLC 17, 2009 · PDF
-
2009
Factors Affecting Work Flow Reliability - A Case StudyMin Liu and Glenn Ballard · IGLC 17, 2009 · PDF
-
2009
Conceptual Estimating in Project Capital Planning and Validation.Scott Morton and Glenn Ballard · IGLC 17, 2009 · PDF
-
2009
Production Control PrinciplesGlenn Ballard, Jamie Hammond and Romano Nickerson · IGLC 17, 2009 · PDF
-
2008
Using Controlled Experiments to Calibrate Computer Models: The Airplane Game as a Lean Simulation ExerciseZofia K. Rybkowski, John-Michael Wong, Glenn Ballard and Iris D. Tommelein · IGLC 16, 2008 · PDF
-
2008
Using the “Five Whys” as a Decision-Making Framework for Evidence-Based DesignZofia K. Rybkowski and Glenn Ballard · IGLC 16, 2008 · PDF
-
2008
Process-Based Cost Modeling to Support Lean Project DeliveryHung V. Nguyen, Iris D. Tommelein and Glenn Ballard · IGLC 16, 2008 · PDF
-
2008
Determining Expected Cost in the Target Costing ProcessAri Pennanen and Glenn Ballard · IGLC 16, 2008 · PDF
-
2008
Improving Construction Work Flow – The Connective Role of Lookahead PlanningFarook R. Hamzeh, Glenn Ballard and Iris D. Tommelein · IGLC 16, 2008 · PDF
-
2008
Improving Labor Productivity Through Production ControlMin Liu and Glenn Ballard · IGLC 16, 2008 · PDF
-
2008
Standard Work From a Lean Theory PerspectivePeter P. Feng and Glenn Ballard · IGLC 16, 2008 · PDF
-
2007
Implementing Lean on Capital ProjectsGlenn Ballard and Yong-Woo Kim · IGLC 15, 2007 · PDF
-
2007
A Case Study on Rebar Supply Chain Management by GS E&CYong-Woo Kim, Changjung Park and Glenn Ballard · IGLC 15, 2007 · PDF
-
2007
A Subcontractor's Lean Journey: A Case Study on IlyangYong-Woo Kim, Jin Woo Jang and Glenn Ballard · IGLC 15, 2007 · PDF
-
2007
Logistics Centers to Support Project-Based Production in the Construction IndustryFarook R. Hamzeh, Iris D. Tommelein, Glenn Ballard and Philip M. Kaminsky · IGLC 15, 2007 · PDF
-
2006
Rethinking Project Definition in Terms of Target CostingGlenn Ballard · IGLC 14, 2006 · PDF
-
2006
How to Promote Off-Site Fabrication Practice of Rebar in Turkey?Gul Polat and Glenn Ballard · IGLC 14, 2006 · PDF
-
2006
Simulation as a Tool for Production System Design in ConstructionThais da C.L. Alves, Iris D. Tommelein and Glenn Ballard · IGLC 14, 2006 · PDF
-
2005
Construction: One Type of Project Production SystemGlenn Ballard · IGLC 13, 2005 · PDF
-
2005
Return on Investment in Construction Innovation — a Lean Construction Case StudyAndre Koerckel and Glenn Ballard · IGLC 13, 2005 · PDF
-
2005
Divergent Focus in the Application of Lean Ideas: Examples From Denmark and CaliforniaBo Jørgensen, Stephen Emmitt and Glenn Ballard · IGLC 13, 2005 · PDF
-
2005
Comparison of the Economics of on-Site and Off-Site Fabrication of Rebar in TurkeyGul Polat and Glenn Ballard · IGLC 13, 2005 · PDF
-
2005
Why Is on-Site Fabrication of Cut & Bent Rebar Preferred in Turkey?Gul Polat and Glenn Ballard · IGLC 13, 2005 · PDF
-
2004
Making Prefabrication LeanGlenn Ballard and Roberto Arbulu · IGLC 12, 2004 · PDF
-
2004
Lean Supply Systems in ConstructionRoberto Arbulu and Glenn Ballard · IGLC 12, 2004 · PDF
-
2004
Improving the Delivery Process for Engineered-To-Order Products - Lessons Learned from Power Distribution EquipmentJan A. Elfving, Iris D. Tommelein and Glenn Ballard · IGLC 12, 2004 · PDF
-
2004
A Theory of Workplace Planning: General Principles and a Management Steering ModelAri Pennanen, Michael Whelton and Glenn Ballard · IGLC 12, 2004 · PDF
-
2004
Fostering Collaboration and Learning in Project Definition: A Case Study in Workplace PlanningMichael Whelton, Ari Pennanen and Glenn Ballard · IGLC 12, 2004 · PDF
-
2004
Waste in Turkish Construction: Need for Lean Construction TechniquesGul Polat and Glenn Ballard · IGLC 12, 2004 · PDF
-
2004
The St. Olaf College Fieldhouse Project: A Case Study in Designing to Target CostGlenn Ballard and Paul Reiser · IGLC 12, 2004 · PDF
-
2003
Kanban in ConstructionRoberto Arbulu, Glenn Ballard and Nigel Harper · IGLC 11, 2003 · PDF
-
2003
An Update on Last PlannerGlenn Ballard and Gregory A. Howell · IGLC 11, 2003 · PDF
-
2003
An International Comparison of the Delivery Process of Power Distribution EquipmentJan A. Elfving, Iris D. Tommelein and Glenn Ballard · IGLC 11, 2003 · PDF
-
2003
Achieving Change in ConstructionLauri Koskela, Glenn Ballard and Greg Howell · IGLC 11, 2003 · PDF
-
2003
Construction Supply Chains: Turkish Supply Chain Configurations for Cut and Bent RebarGul Polat and Glenn Ballard · IGLC 11, 2003 · PDF
-
2003
Dynamic States of Project Purpose: Transitions From Customer Needs to Project Requirements - Implications for Adaptive ManagementMichael Whelton and Glenn Ballard · IGLC 11, 2003 · PDF
-
2002
Working Near the Edge: A New Approach to Construction SafetyGregory A. Howell, Glenn Ballard, Tariq S. Abdelhamid and Panagiotis Mitropoulos · IGLC 10, 2002 · PDF
-
2002
Project Definition and Wicked ProblemsMichael Whelton and Glenn Ballard · IGLC 10, 2002 · PDF
-
2002
An Application of Lean Concepts and Techniques to Precast Concrete FabricationGlenn Ballard, Nigel Harper and Todd Zabelle · IGLC 10, 2002 · PDF
-
2002
Reducing Lead Time for Electrical SwitchgearJan Elfving, Iris D. Tommelein and Glenn Ballard · IGLC 10, 2002 · PDF
-
2002
Case Study - Overhead Costs AnalysisYong-Woo Kim and Glenn Ballard · IGLC 10, 2002 · PDF
-
2001
Production System Design in ConstructionGlenn Ballard, Lauri Koskela, Gregory Howell and Todd Zabelle · IGLC 9, 2001 · PDF
-
2001
Cycle Time Reduction in Home BuildingGlenn Ballard · IGLC 9, 2001 · PDF
-
2001
Capacity Utilization and Wait Time: A Primer for ConstructionGregory A. Howell, Glenn Ballard and Jerome Hall · IGLC 9, 2001 · PDF
-
2001
Activity-Based Costing and Its Applicationto Lean ConstructionYong-Woo Kim and Glenn Ballard · IGLC 9, 2001 · PDF
-
2001
Problems in the Interface Between Mechanical Design and Construction: A Research ProposalRobert S. Miles and Glenn Ballard · IGLC 9, 2001 · PDF
-
2001
Application of Design Rationale Systems to Project Definition – Establishing a Research ProjectMichael Whelton, Glenn Ballard and Iris Tommelein · IGLC 9, 2001 · PDF
-
2000
Positive Vs. Negative Iteration in DesignGlenn Ballard · IGLC 8, 2000 · PDF
-
2000
Contribution of Specialty Contractor Knowledge to Early DesignN. Gil, I.D. Tommelein, R.L. Kirkendall and G. Ballard · IGLC 8, 2000 · PDF
-
2000
Integrating Design Planning, Scheduling, and Control With DePlanJamie Hammond, Hyun Jeong Choo, Simon Austin, Iris D. Tommelein and Glenn Ballard · IGLC 8, 2000 · PDF
-
2000
Is the Earned-Value Method an Enemy of Work Flow?Yong-Woo Kim and Glenn Ballard · IGLC 8, 2000 · PDF
-
1999
Bringing Light to the Dark Side of Lean Construction: A Response to Stuart GreenGregory A. Howell and Glenn Ballard · IGLC 7, 1999 · PDF
-
1999
Improving Work Flow ReliabilityGlenn Ballard · IGLC 7, 1999 · PDF
-
1998
What Kind of Production Is Construction?Glenn Ballard and Greg Howell · IGLC 6, 1998 · PDF
-
1998
On the Agenda of Design Management ResearchGlenn Ballard and Lauri Koskela · IGLC 6, 1998 · PDF
-
1998
Workplan: Database for Work Package Production SchedulingHyun Jeong Choo, Iris D. Tommelein, Glenn Ballard and Todd R. Zabelle · IGLC 6, 1998 · PDF
-
1998
Implementing Lean Construction: Understanding and ActionGreg Howell and Glenn Ballard · IGLC 6, 1998 · PDF
-
1997
Lookahead Planning: The Missing Link in Production ControlGlenn Ballard · IGLC 5, 1997 · PDF
-
1997
Contracting for Lean Performance: Contracts and the Lean Construction TeamRobert Miles and Glenn Ballard · IGLC 5, 1997 · PDF
-
1997
Towards Lean Design ManagementLauri Koskela, Glenn Ballard and Veli-Pekka Tanhuanpää · IGLC 5, 1997 · PDF
-
1996
PARC: A Case StudyGlenn Ballard, Mike Carsten and Greg Howell · IGLC 4, 1996 · PDF
-
1996
Can Project Controls Do Its Job?Gregory Howell and Glenn Ballard · IGLC 4, 1996 · PDF
-
1996
Beyond Partnering: Toward a New Approach to Project Management?Greg Howell, Robert Miles, Charlie Fehlig and Glenn Ballard · IGLC 4, 1996 · PDF