Eduardo L. Isatto
16 papers at 12 conferences, 1998–2026.
ORCID 0000-0002-0851-8790
Also published as Eduardo Luís Isatto, Eduardo Luis Isatto.
-
2026
Semantic Blindness in Digital LPS SystemsRaquel H. Reck and Eduardo L. Isatto · IGLC 34, 2026 · PDF
-
2026
Beyond lean production: interpreting the Last Planner System from a resilience engineering perspectiveDouglas C. Hamerski, Carlos T. Formoso, Tarcisio. A. Saurin and Eduardo L. Isatto · IGLC 34, 2026 · PDF
- 2020
- 2019
-
2016
Difficulties in Work Design in the Construction SectorWanessa Roberta Fazinga, Fernanda Aranha Saffaro, Eduardo Luis Isatto and Alessandro Kremer · IGLC 24, 2016 · PDF
-
2014
Integrating Production and Quality Control with the Support of Information TechnologyCibeli F. Leão, Carlos T. Formoso and Eduardo L. Isatto · IGLC 22, 2014 · PDF
-
2011
An Exploratory Study on the Measurement and Analysis of Making-Do in Construction SitesCarlos T. Formoso, Lucila Sommer, Lauri Koskela and Eduardo L. Isatto · IGLC 19, 2011 · PDF
-
2011
Modelling the Network of Commitments in the Last Planner SystemDaniela Dietz Viana, Carlos Torres Formoso and Eduardo Luís Isatto · IGLC 19, 2011 · PDF
-
2010
Simulating the Last Planner With Systems DynamicBruno P. Mota, Daniela D. Viana and Eduardo L. Isatto · IGLC 18, 2010 · PDF
-
2008
Implementing Customized Method for the Evaluation of SubcontractorsGuilherme Biesek, Eduardo L. Isatto and Carlos T. Formoso · IGLC 16, 2008 · PDF
-
2007
Integrating Strategic Project Supply Chain Members in Production Planning and ControlMarcus P. Sterzi, Eduardo L. Isatto and Carlos T. Formoso · IGLC 15, 2007 · PDF
-
2006
The Inter-Firm Coordination of the Construction Project Supply ChainEduardo L. Isatto and Carlos T. Formoso · IGLC 14, 2006 · PDF
-
2006
The Importance of Commitments Management to the Integration of Make-to- Order Supply Chains in Construction IndustryMarcelo M. B. Azambuja, Eduardo L. Isatto, Tiago S. Marder and Carlos T. Formoso · IGLC 14, 2006 · PDF
-
1999
Method for Waste Control in the Building IndustryCarlos T. Formoso, Eduardo L. Isatto and Ercilia H. Hirota · IGLC 7, 1999 · PDF
-
1998
Design and Production Interface in Lean Production: A Performance Improvement Criteria PropositionEduardo L. Isatto and Carlos T. Formoso · IGLC 6, 1998 · PDF
-
1998
Design and Production Interface in Lean Production: A Performance Improvement Criteria PropositionEduardo L. Isatto and Carlos T. Formoso · IGLC 6, 1998 · PDF