Daniela Dietz Viana
20 papers at 13 conferences, 2010–2026.
ORCID 0000-0001-8958-4708
Also published as Daniela D. Viana, Daniela Viana.
-
2026
Critical infrastructures interdependences during extreme weather events: the lean perspectiveGuilherme Luiz Canzian Marion, Tarcisio Abreu Saurin and Daniela Dietz Viana · IGLC 34, 2026 · PDF
-
2025
Model for Production System Design in Modular Construction ProjectsFernanda S. Bataglin, Carlos T. Formoso and Daniela D. Viana · IGLC 33, 2025 · PDF
- 2021
- 2021
- 2021
- 2021
- 2020
-
2018
Understanding the Effectiveness of Visual Management Best Practices in Construction SitesFernanda M. P. Brandalise, Caroline P. Valente, Daniela D. Viana and Carlos T. Formoso · IGLC 26, 2018 · PDF
-
2017
Application of Bim for Supporting Decisionmaking Related to Logistics in Prefabricated Building SystemsFernanda S. Bataglin, Daniela D. Viana, Carlos T. Formoso and Iamara R. Bulhões · IGLC 25, 2017 · PDF
-
2016
Guidelines for Integrated Production Control in Engineer-to-Order Prefabricated Concrete Building Systems: Preliminary ResultsGuillermina A. Peñaloza, Daniela Dietz Viana, Fernanda Saidelles Bataglin, Carlos Torres Formoso and Iamara Rossi Bulhões · IGLC 24, 2016 · PDF
-
2016
Role of Loading Plans in the Control of Work in Progress for Engineer-to-Order Prefabricated Building SystemsGuilherme Trevisan, Daniela Viana and Carlos Formoso · IGLC 24, 2016 · PDF
-
2015
Analysis of HVAC Subcontractor Mechanisms for JIT Materials Supply to a Construction SiteDaniela Viana, Patrícia Tillmann, Zach Sargent, Iris Tommelein and Carlos Formoso · IGLC 23, 2015 · PDF
-
2015
BIM and Lean in the Design-Production Interface of ETO Components in Complex ProjectsPatricia Tillmann, Daniela Viana, Zach Sargent, Iris Tommelein and Carlos Formoso · IGLC 23, 2015 · PDF
-
2014
The Role of Visual Management in Collaborative Integrated Planning and Control for Engineer-to-Order Building SystemsDaniela Viana, Carlos Formoso, Josana Wesz and Patrícia Tzortzopoulos · IGLC 22, 2014 · PDF
-
2013
Guidelines for integrated planning and control of engineer-to-order prefabrication systemsDaniela Dietz Viana, Iamara Rossi Bulhões and Carlos Torres Formoso · IGLC 21, 2013 · PDF
-
2012
Waste in Construction: a Systematic Literature Review on Empirical StudiesDaniela Dietz Viana, Carlos Torres Formoso and Bo Terje Kalsaas · IGLC 20, 2012 · PDF
-
2011
Modelling the Network of Commitments in the Last Planner SystemDaniela Dietz Viana, Carlos Torres Formoso and Eduardo Luís Isatto · IGLC 19, 2011 · PDF
-
2010
PROCESS TRANSPARENCY ON CONSTRUCTION SITES: EXAMPLES FROM CONSTRUCTION COMPANIES IN BRAZILAlgan Tezel, Lauri J Koskela, Patricia Tzortzopoulos-Fazenda, Carlos T. Formoso, Thais Alves, Barros Neto, Daniela Viana and Bruno Mota · IGLC 18, 2010 · PDF
-
2010
Simulating the Last Planner With Systems DynamicBruno P. Mota, Daniela D. Viana and Eduardo L. Isatto · IGLC 18, 2010 · PDF
-
2010
A SURVEY ON THE LAST PLANNER SYSTEM: IMPACTS AND DIFFICULTIES FOR IMPLEMENTATION IN BRAZILIAN COMPANIESDaniela Dietz Viana, Bruno Mota, Carlos T. Formoso, Márcia Echeveste, Marjana Peixoto and Caroline L. Rodrigues · IGLC 18, 2010 · PDF