-
2026
Relating Non-Physical Waste in Lean Construction to Carbon Emissions during Project ExecutionAbdhy Gazali, Muhammad Sapto Nugroho, Wildan Nachdy and Annisa Nurrahmawati · IGLC 34, 2026 · PDF
-
2026
Impacts of waiting-type non-physical waste on schedule deviation in lean-managed building projects in IndonesiaAbdhy Gazali, Anang Wirdianto, Aminullah Aminullah, Anisah Anisah, Refia Alaida and Lintang Tirta Sari · IGLC 34, 2026 · PDF
-
2025
Simulation of Takt Time Planning Study Case: Housing in the New Capital City of IndonesiaRina Asri Aisyah, Abdhy Gazali, Prama Putra, Andek Prabowo, Galang Bastiono and Helen Libastari · IGLC 33, 2025 · PDF
-
2025
Bridging Theory and Practice: Evaluating Lean Construction with Lego SimulationsAbdhy Gazali, Rina Asri Aisyah, Yusuf Maharani, Prama Putra and Alfandi Ziqri · IGLC 33, 2025 · PDF
-
2023
Lean Construction Through Waste Register Method: A Case Studies Project in IndonesiaRina Asri Aisyah, Kevin Gunawan and Abdhy Gazali · IGLC 31, 2023 · PDF