Sounding the Potential of Lean Construction: A Case Study

  1. VTT Building Technology, P.O. Box 1801, FI-02044 VTT, Finland
  2. VTT Building Technology, P.O. Box 1801, FI-02044 VTT, Finland
  3. VTT Building Technology, P.O. Box 1801, FI-02044 VTT, Finland

Abstract

The paper gives an overview on the results of a case study, where the progress of a fast track office building project was monitored. Two main issues are considered: What were the time and cost consequences of the speeding up methods utilized? What would have been the potential of further speeding up?