IGLC 16 · Manchester, UK · 2008
Last Planner in a Social Perspective – A Shipbuilding Case
- Researcher, Fafo Institute for labour and social research, P.O. Box 2947 Töyen, 0608 Oslo, Norway, Phone +47 2208 8669, sigmund.aslesen@fafo.no
- External lecturer, Danish Technical University, Roennebaervej 10, 2840 Holte, Denmark, Phone +45 4542 4705, sven@bertelsen.org
Abstract
This paper addresses the implementation and use of Last Planner System for production control to improve workflow reliability in a Norwegian shipyard. The paper clarifies the adjustments made to adapt this system and particularly stresses the difficulties and challenges faced during the transformation from a rational operationoriented to a process-oriented approach to production planning and control. The paper suggests that to benefit from employing Last Planner, making a system of collaborative improvement must be part of it. More generally, the paper is a first step to a deeper understanding of why Last Planner works from a sociological point of view and in investigating its application to other types of project production.
Keywords
- production control
- project production
- people
- culture and change
- last planner
Cite this paper
APA 7th edition
Aslesen, S., & Bertelsen, S. (2008). Last Planner in a Social Perspective – A Shipbuilding Case. In P. Tzortzopoulos, & M. Kagioglou (Eds.), 16th Annual Conference of the International Group for Lean Construction (pp. 333–344).
Shortened reference for IGLC papers
Aslesen, S., & Bertelsen, S. (2008). Last Planner in a Social Perspective – A Shipbuilding Case. IGLC16.