Interpreting and operationalizing enterprise agility in construction: a safe-based case study
- Vice President, Formosa Builders Inc., Master’s Student, Department of Civil Engineering, National Taiwan University, Taipei, Taiwan, sophia.lee@formosa94.com.tw, orcid.org/0009-0004-1684-3915
- Master’s Student, Department of Civil Engineering, National Taiwan University, Taipei, Taiwan, r13521725@ntu.edu.tw, orcid.org/0009-0003-7498-388X
- Associate Professor, Department of Civil Engineering, National Taiwan University, Taipei, Taiwan, jacoblin@ntu.edu.tw, orcid.org/0000-0002-3781-9402
https://doi.org/10.24928/2026/0263
Abstract
Despite its large economic scale, global construction productivity has stagnated over the past two decades, with fewer than 1% of mega-projects meeting cost, schedule, and benefit targets. These persistent performance challenges are a result of the high complexity, non-standard nature, and high multi-stakeholder coordination demand of construction projects, which strain rigid conventional management models. Enterprise agility has been widely adopted in other industries to address similar limitations in flexibility and coordination; however, there is a lack of empirically grounded interpretations of how agility transformation frameworks can be meaningfully adapted to the construction industry. This study examines how enterprise agility can be interpreted and operationalized within a construction organization. Using the Scaled Agile Framework for Enterprise (SAFe) as an analytical reference architecture, a qualitative case study is conducted of a large-scale general contractor in Taiwan, with analyses interpreted within the context of Lean Construction principles. An explicit competency mapping procedure is used to analyze observed lean-agile organizational practices against SAFe’s five core competencies. The results show that enterprise agility in construction emerges selectively across SAFe competencies, manifesting most strongly in leadership enablement, cross-functional coordination, and pre-construction value planning, while portfolio-level agility remains fundamentally constrained by contractual and financial commitments.
Keywords
- Value stream
- Transformation-Flow-Value
- collaboration
- agile transformation
- lean construction.
Cite this paper
APA 7th edition
Lee, C.-Y., Tan, B. D., & Lin, J. J. (2026). Interpreting and operationalizing enterprise agility in construction: a safe-based case study. In F. Hamzeh, M. Poshdar, N. P. Garcia-Lopez, & V. Gan (Eds.), Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34) (pp. 1252–1264). https://doi.org/10.24928/2026/0263
Shortened reference for IGLC papers
Lee, C.-Y., Tan, B. D., & Lin, J. J. (2026). Interpreting and operationalizing enterprise agility in construction: a safe-based case study. IGLC34. https://doi.org/10.24928/2026/0263