IGLC 26 · Chennai, India · 2018

Last Planner Implementation in Building Projects

  1. Ph.D. Student, SRM Institute of Science and Technology, Ramapuram, Chennai, 600089, ssrajan18@yahoo.co.in
  2. Professor and Head(Civil), SRM Institute of Science and Technology, Ramapuram, Chennai, 600089, tcmadhvi@yahoo.com

https://doi.org/10.24928/2018/0528

Abstract

Lean Construction method is considered the core principle behind the Identification and Elimination of various wastes in construction. While there are many Conventional Lean Tools like work standardization, doing it right first time, Audits, Just in Time etc., Lean construction identifies and deals with seven forms of waste which is nothing but nonvalue adding items in construction and also suggests ways and means to eliminate them. As such material wastage can be easily quantified, labour wastage and non-value-added activities by labour was much higher compared to material wastage generated in the construction sites. While, Lean production attempts to integrate the concept of transformation, flow and value, a method such as Last planner when implemented for various finishing activities in building projects, there really exists a sense of deep involvement and a great achievement of the project goal. We discuss in this paper the methodology adopted to implement the Last Planner tool of Lean construction and the improvement thereafter.

Keywords

  • Lean construction
  • Lean Principles
  • Last Planner
  • Labour activities
  • target works

Cite this paper

APA 7th edition

S, S., & Ch, M. T. (2018). Last Planner Implementation in Building Projects. In 26th Annual Conference of the International Group for Lean Construction (pp. 840–847). https://doi.org/10.24928/2018/0528

Shortened reference for IGLC papers

S, S., & Ch, M. T. (2018). Last Planner Implementation in Building Projects. IGLC26. https://doi.org/10.24928/2018/0528