Make Ready Planning Using Flow Walks: A New Approach to Collaboratively Identifying Project Constraints
- Research Fellow, Centre for Lean Projects, NTU - Nottingham Trent University, UK, +353 85 804 9623, paul.ebbs@ntu.ac.uk
- Professor of Lean Project Management, Centre for Lean Projects, NTU - Nottingham Trent University, christine.pasquire@ntu.ac.uk
https://doi.org/10.24928/2018/0448
Abstract
Many authors identify flow and pull as key lean production principles. In lean construction (LC)these principles are embodied within the “Last Planner® System” (LPS) to create more reliable workflow which is the heart of Lean Project Delivery. LPS has continued to evolve and develop over the last 25 years with pull planning – identifying what tasks SHOULD be done - the last major elementadded. However, “pull planning” is often misunderstood as the entirety of LPS and frequently referred to as “Last Planner”. The remaining levels of the Last Planner “System” – CAN; WILL; DID and LEARN - are not being used as originally intended by LPS developers Ballard and Howell. The struggle often begins with Make Ready Planning (CAN). This paper is the first output of a two-year research project focused on implementing the CAN; WILL; DID; LEARN levels of LPS within organisation (X). It outlines how the 8 Flows of Lean Project Delivery andthe“Flow Walk” are being used as a structured approach to collaboratively identify constraints and incorporate them into the risk registers and Make Ready Planning. This approach was effective to identify constraints and also create a shared understanding of project scope within project teams.
Keywords
- Last Planner System
- Make Ready
- Flow Walks
- Constraints
- Risk Management
Cite this paper
APA 7th edition
Ebbs, P. J., & and Pasquire, C. L. (2018). Make Ready Planning Using Flow Walks: A New Approach to Collaboratively Identifying Project Constraints. In 26th Annual Conference of the International Group for Lean Construction (pp. 734–743). https://doi.org/10.24928/2018/0448
Shortened reference for IGLC papers
Ebbs, P. J., & and Pasquire, C. L. (2018). Make Ready Planning Using Flow Walks: A New Approach to Collaboratively Identifying Project Constraints. IGLC26. https://doi.org/10.24928/2018/0448