IGLC 9 · Singapore, Singapore · 2001

De-Coupling Cladding Installation From Other High-Rise Building Trades: A Case Study

  1. Professor, Constr. Engrg. and Mgmt. Program, Dept. of Civil and Envir. Engrg., 215-A McLaughlin Hall, Berkeley, CA 94720-1712, 510/643-8678, FAX: 510/643-8919, tommelein@ce.berkeley.edu, http://www.ce.berkeley.edu/~tommelein
  2. Director of Market Development, Beeche Systems Corp., Scotia-Glenville Industrial Park Building 202, Scotia, NY 12302, 518/381-6000, FAX: 518/381-4613, gbeeche@beeche.com, http://www.beeche.com/

Abstract

This paper presents a system to handle and install exterior cladding on high-rise buildings. The system is innovative in that the cladding panels are installed from the building’s exterior without the use of a tower crane or man lift, and without on-floor staging. Accordingly, all work pertaining to the panels effectively is de-coupled from most other construction work going on concurrently on site. This results in flexibility and work that can progress at a fast, continuous pace, thereby also allowing for project schedule acceleration. The paper includes illustrations of the use of this innovative cladding installation system in the process of constructing the 70-story Trump World Tower in New York City. The system was developed recognizing that tight handoffs between trades may lead to detrimental performance. De-coupling of interacting trades is one step towards implementing a lean construction system.

Keywords

  • Parade of trades
  • interacting sub-cycles
  • de-coupling
  • exterior cladding installation
  • curtain wall construction
  • high-rise building construction
  • Trump World Tower
  • lean construction.

Cite this paper

APA 7th edition

Tommelein, I. D., & Beeche, G. (2001). De-Coupling Cladding Installation From Other High-Rise Building Trades: A Case Study. In G. Ballard, & D. Chua (Eds.), 9th Annual Conference of the International Group for Lean Construction.

Shortened reference for IGLC papers

Tommelein, I. D., & Beeche, G. (2001). De-Coupling Cladding Installation From Other High-Rise Building Trades: A Case Study. IGLC9.