IGLC 22 · Oslo, Norway · 2014
Understanding Production Management of Refurbishment Projects of a Housing Association – an Exploratory Case Study
- PhD Candidate, School of the Built Environment, 7th Floor, Maxwell Building, Phone +44 1612956898, The University of Salford, Salford M5 4WT, United Kingdom, S.Kemmer@edu.salford.ac.uk; sergiokemmer@gmail.com
- Professor, School of the Built Environment, 5th Floor, Maxwell Building, Phone +44 1612956378, The University of Salford, Salford M5 4WT, United Kingdom, L.J.Koskela@salford.ac.uk
Abstract
This paper aims at better understanding on how the production phase of housing refurbishment projects is managed in the context of a housing association in the UK. This refers to the way that refurbishments are carried out, the typical problems faced at the construction stage, the influential factors affecting planning and control effectiveness, and the identification of the current managerial practices adopted by construction companies for managing production. Information was collected through semi-structured interviews, non-participant observations of project management meetings and works on site, and documental analysis. The information gathered was validated through a workshop involving project participants. The paper concludes presenting the good managerial practices identified and the opportunities for improvement.
Keywords
- Refurbishment
- production
- management
- lean construction.
Cite this paper
APA 7th edition
Kemmer, S., & Koskela, L. (2014). Understanding Production Management of Refurbishment Projects of a Housing Association – an Exploratory Case Study. In B. T. Kalsaas, L. Koskela, & T. A. Saurin (Eds.), 22nd Annual Conference of the International Group for Lean Construction (pp. 651–662).
Shortened reference for IGLC papers
Kemmer, S., & Koskela, L. (2014). Understanding Production Management of Refurbishment Projects of a Housing Association – an Exploratory Case Study. IGLC22.