Rafael Sacks
43 papers at 23 conferences, 2003–2026.
ORCID 0000-0001-9427-5053
Also published as Rafael Sacks2.
-
2026
The WIP-Push-Wave: a leading indicator for project production controlDoron S. Gabai, Eran Haronian, Rafael Sacks, Mark K. Miera and Tabitha D. Cloyd · IGLC 34, 2026 · PDF
-
2025
Optimized Cycle-time Flow Batching: Enhanced Performance in Project Portfolio ManagementDoron S. Gabai, Eran Haronian, Rafael Sacks, Mark K. Miera, Tabitha D. Cloyd and Nicah Wong · IGLC 33, 2025 · PDF
-
2025
Practices and Barriers to the Adoption of Digital Twin Construction in Latin AmericaJhonattan G. Martinez, Zulay Giménez, Luis Salazar, Luis Alva, Luis F. Alarcón, Timson Yeung and Rafael Sacks · IGLC 33, 2025 · PDF
-
2024
Doubling Throughput With Optimized Cycle-Time Flow (OCF) StrategyDoron S. Gabai, Eran Haronian, Nikita S. Kennard, Rafael Sacks, Mark K. Miera and Tabitha D. Cloyd · IGLC 32, 2024 · PDF
-
2023
Role of Work Flow in Reducing Life Cycle Energy Consumption in ConstructionMusab Jamal Maraqa, Rafael Sacks and Sabrina Spatari · IGLC 31, 2023 · PDF
-
2023
Repeatable, Scalable, Global Implementation of Optimized Cycle-Time Flow (OCF)Doron S. Gabai, Nikita S. Kennard, Rafael Sacks, Mark K. Miera and Tabitha D. Cloyd · IGLC 31, 2023 · PDF
-
2023
Predictive Simulation for Automated Decision-Support in Production Planning and ControlTimson Yeung, Jhonattan Guillermo Martinez Ribón, Li-Or Sharoni, Rafael Sacks and Tomi Pitkäranta · IGLC 31, 2023 · PDF
-
2023
The PICO Framework for Analysis and Design of Production Systems for ConstructionLi-Or Sharoni, Rafael Sacks, Timson Yeung, Otto Alhava, Enni Laine and Jhonattan Martinez Ribon · IGLC 31, 2023 · PDF
-
2022
Role of Lean and VDC in Reducing Physical and Operational Waste and Environmental ImpactMusab Jamal Maraqa, Rafael Sacks and Sabrina Spatari · IGLC 30, 2022 · PDF
- 2020
- 2020
- 2020
- 2019
- 2019
-
2018
Lean-Driven Passenger Experience DesignFilippo Bosi, Maria Antonietta Esposito and Rafael Sacks · IGLC 26, 2018 · PDF
-
2017
A Portfolio/Process/Operations (PPO) Analysis of a Meta-Project Production System in Renovation ProjectsSamuel Korb, Rafael Sacks and Otto Alhava · IGLC 25, 2017 · PDF
-
2016
Agent-Based Simulation of Construction Workflows Using a Relational Data ModelLing Ma and Rafael Sacks · IGLC 24, 2016 · PDF
-
2016
One Size Does Not Fit All: Rethinking Approaches to Managing the Construction of Multi-Story Apartment BuildingsSamuel Korb and Rafael Sacks · IGLC 24, 2016 · PDF
-
2016
Overcoming “But We’re Different”: An IPD Implementation in the Middle EastSamuel Korb, Eran Haronian, Rafael Sacks, Pedro Judez and Ory Shaked · IGLC 24, 2016 · PDF
-
2015
Constructible Bim Elements –a Root Cause Analysis of Work Plan FailuresLaurie Spitler, Tom Feliz, Nathan Wood and Rafael Sacks · IGLC 23, 2015 · PDF
-
2015
Simulating and Vizualising Emergent Production in Construction (EPIC) Using Agents and BIMLola Ben-Alon and Rafael Sacks2 · IGLC 23, 2015 · PDF
-
2015
Interplay of Lean Thinking and Social Dynamics in ConstructionVicente A. González, Rafael Sacks, Ignacio Pavez, Mani Poshdar, Lola Ben Alon and Vitaly Priven · IGLC 23, 2015 · PDF
-
2014
A Lean Workflow Index for Construction ProjectsVitaliy Priven, Rafael Sacks, Olli Seppänen and Jonathan Savosnick · IGLC 22, 2014 · PDF
-
2013
Social Network Development in Last Planner System ImplementationsVitaliy Priven and Rafael Sacks · IGLC 21, 2013 · PDF
-
2013
Learning to See – Managers Working in the Gemba as Part of the Tidhar Way Training ProgramCheni Kerem, Ronen Barak, Rafael Sacks and Vitaliy Priven · IGLC 21, 2013 · PDF
-
2012
A Brief History of the Concept of Waste in ProductionLauri Koskela, Rafael Sacks and John Rooke · IGLC 20, 2012 · PDF
-
2012
Go or No-Go Decisions at the Construction Workface: Uncertainty, Perceptions of Readiness, Making Ready and Making-DoErgo Pikas, Rafael Sacks and Vitaliy Priven · IGLC 20, 2012 · PDF
-
2011
Conceptualization of Interdependency and Coordination Between Construction TasksBo Terje Kalsaas and Rafael Sacks · IGLC 19, 2011 · PDF
-
2011
Field Tests of the Kanbim™ Lean Production Management SystemRafael Sacks, Ronen Barak, Biniamin Belaciano, Ury Gurevich and Ergo Pikas · IGLC 19, 2011 · PDF
-
2010
The Relationship Between Information Flow and Project Success in Multi-Disciplinary Civil Engineering DesignEffi Thibelsky and Rafael Sacks · IGLC 18, 2010 · PDF
-
2010
Implementation of Pull Control in Finishing Works With Re-Entrant FlowIrina Brodetskaia, Rafael Sacks and Aviad Shapira · IGLC 18, 2010 · PDF
-
2009
Analysis Framework for the Interaction Between Lean Construction and Building Information ModellingRafael Sacks, Bhargav A. Dave, Lauri Koskela and Robert Owen · IGLC 17, 2009 · PDF
-
2008
Partial Remuneration for Capacity to Stabilize Subcontractor Resource AllocationsRafael Sacks and Michael Harel · IGLC 16, 2008 · PDF
-
2008
Craft Construction, Mass Construction, Lean Construction: Lessons From the Empire State BuildingRebecca Partouche, Rafael Sacks and Sven Bertelsen · IGLC 16, 2008 · PDF
-
2007
Towards a New Understanding of the Construction Industry and the Nature of Its ProductionSven Bertelsen and Rafael Sacks · IGLC 15, 2007 · PDF
-
2007
Understanding Flow and Micro-Variability in Construction: Theory and PracticeIrina Brodetskaia and Rafael Sacks · IGLC 15, 2007 · PDF
-
2006
Evaluation of Lean Improvements in Residential Construction Using Computer SimulationAlberto Esquenazi and Rafael Sacks · IGLC 14, 2006 · PDF
-
2006
How Last Planner Motivates Subcontractors to Improve Plan Reliability – a Game Theory ModelRafael Sacks and Michael Harel · IGLC 14, 2006 · PDF
-
2006
Subcontractor Resource Allocation in a Multi-Project Environment – Field StudyMichael Harel and Rafael Sacks · IGLC 14, 2006 · PDF
-
2005
Pull-Driven Construction of High-Rise Apartment BuildingsRafael Sacks, Maxim Goldin and Zvika Derin · IGLC 13, 2005 · PDF
-
2005
Lean Scheduling for Safety: Development of a Time-Dependent Risk Level ModelRafael Sacks, Ophir Rozenfeld and Yehiel Rosenfeld · IGLC 13, 2005 · PDF
-
2004
Towards a Lean Understanding of Resource Allocation in a Multi-Project Sub-Contracting EnvironmentRafael Sacks · IGLC 12, 2004 · PDF
-
2003
3D Modeling and Real-Time Monitoring in Support of Lean Production of Engineered-to-Order Precast Concrete BuildingsRafael Sacks, Burcu Akinci and Esin Ergen · IGLC 11, 2003 · PDF