Authors

Mohamed Al-Hussein

12 papers at 10 conferences, 2007–2026.

ORCID 0000-0002-1774-9718

  1. 2026
    Safety risk factors associated with a lean wood-framing prefabrication facility: a case study
    Vishal Sharma, Don Mah, Neetu Sharma, Mohamed Al-Hussein, Ahmed Bouferguene and Haitao Yu · IGLC 34, 2026 · PDF
  2. 2025
    Impacts of Prefabrication on Construction Workers’ Wellbeing: a Case Study
    Vishal Sharma, Don Mah, Neetu Sharma, Mohamed Al-Hussein, Ahmed Bouferguene and Haitao Yu · IGLC 33, 2025 · PDF
  3. 2023
    Factors Influencing Cycle Times in Offsite Construction
    Fatima Alsakka, Haitao Yu, Farook Hamzeh and Mohamed Al-Hussein · IGLC 31, 2023 · PDF
  4. 2023
    Application of Fuzzy Logic for Selection of Off-Site Construction Approach
    Amirhossein Mehdipoor, Ivanka Iordanova and Mohamed Al-Hussein · IGLC 31, 2023 · PDF
  5. 2022
  6. 2022
    The Impacts of Lean Implementation Revealed in the Course of Building a Digital Twin of a Construction Manufacturing Facility
    Fatima Alsakka, Mohammad Darwish, Haitao Yu, Farook Hamzeh and Mohamed Al-Hussein · IGLC 30, 2022 · PDF
  7. 2020
    Integrated Simulation and Lean Approach for Production Line Improvement in a Prefabricated Panelized Homebuilding Facility
    Mohammad Darwish, Osama Mohsen, Yasser Mohamed and Mohamed Al-Hussein · IGLC 28, 2020 · PDF · Slides
  8. 2019
    Predicting Performance Indicators Using BIM and Simulation for a Wall Assembly Line
    Ryan Brown, Beda Barkokebas, Chelsea Ritter and Mohamed Al-Hussein · IGLC 27, 2019 · PDF
  9. 2017
    Simulation of Production Line Improvement in Modular Home Manufacturing
    Chelsea Ritter, Youyi Zhang, Roger Dupuis and Mohamed Al-Hussein · IGLC 25, 2017 · PDF
  10. 2014
    An Enhanced Scheduling Technique for Modular Construction Manufacturing
    Mana Moghadam and Mohamed Al-Hussein · IGLC 22, 2014 · PDF
  11. 2013
    Resource Optimization for Modular Construction Through Value Stream Map Improvement
    Mana Moghadam and Mohamed Al-Hussein · IGLC 21, 2013 · PDF
  12. 2007
    Managing Variability In-House Production
    Haitao Yu, Tarry Tweed, Mohamed Al-Hussein and Reza Nasseri · IGLC 15, 2007 · PDF