The paper describes the experience of a civil engineering company of a small town in São Paulo State of introducing a model of production management in sites based on the concepts of Lean Construction. It presents the concept outlining of the model and reviews the practical results obtained in the construction of a library in the city of Campinas during the period of 18 months.
Production management; civil engineering; information flow
Conte, A. S. I. 1998. Last Planner, Look Ahead, PPC: a Driver to the Site Operations, 6th Annual Conference of the International Group for Lean Construction , -. doi.org/ a >
Download: BibTeX | RIS Format