Safety and Production - An Integrated Planning and Control Model

Tarcisio A. Saurin1, Carlos T. Formoso2, Lia B.M. Guimaraes3 & Aelandre C. Soares4

1M.Sc., Assistant Professor at the University of Caxias do Sul (UCS) and Ph.D. candidate at LOPP/UFRGS (Product and Process Optimization Laboratory, Federal University of Rio Grande do Sul). Praça Argentina nº 9, 3º andar - sala LOPP. Porto Alegre, RS, Brasil. CEP 90040-020. E-mail: [email protected]
2Ph.D., Associate Professor, Federal University of Rio Grande do Sul, PPGEC – Postgraduate Program in Civil Engineering, Av. Osvaldo Aranha, nº 99, 3º andar, Porto Alegre - RS, Brazil, CEP 90035- 190, [email protected]
3Ph.D., C.P.E. Associate Professor at LOPP/UFRGS (Product and Process Optimization Laboratory, Federal University of Rio Grande do Sul). Praça Argentina nº 9, 3º andar - sala LOPP. Porto Alegre, RS, Brasil. CEP 90040-020. E-mail: [email protected]
4M.Sc. candidate at NORIE/UFRGS, Quality manager at BSF Engenharia. E-mail: [email protected]

Abstract

This paper presents a safety planning and control model (SPC) that has been integrated to the production planning and control process. The model integrates safety into three hierarchical levels of production control. Safety long-term planning starts with the preliminary hazard analysis (PHA) of construction processes. These plans are detailed and updated at both medium-term and short-term planning levels. The main performance measure adopted for safety evaluation at the short-term level is the Percentage of Safe Work Packages (PSW), which monitors the degree in which work packages are safely carried out. The model also proposes a participatory mechanism that allows workers to point out existing risks as well as to evaluate risk controls. This paper discusses an empirical study in which the model was implemented in the refurbishment of an industrial building.

Keywords

Safety, production planning and control, operations management, performance measurement.

Files

Reference

Saurin, T. A. , Formoso, C. T. , Guimaraes, L. B. & Soares, A. C. 2002. Safety and Production - An Integrated Planning and Control Model, 10th Annual Conference of the International Group for Lean Construction , -. doi.org/

Download: BibTeX | RIS Format