https://doi.org/10.24928/2019/0135

Optimizing Material-Related Costs Using Dynamic Site Layout and Supply Chain Planning

Sarah Abou Dargham1, Sena Assaf2, Karim Faour3 & Farook Hamzeh4

1Graduate Student, Civil and Environmental Engineering Department, American University of Beirut, Lebanon, Phone +961 76 547 177, [email protected]
2Graduate Student, Civil and Environmental Engineering Department, American University of Beirut, Lebanon, Phone +961 71 834 900, [email protected]
3Civil Engineering Graduate, Civil and Environmental Engineering Department, American University of Beirut, Lebanon, Phone +961 71 112 886, [email protected]
4Associate Professor, Civil and Environmental Engineering Department, University of Alberta, Canada, [email protected]

Abstract

Understanding a construction site layout is a crucial step before allocating resources to it; space is a critical factor that impacts both labor productivity and ease of material reach when needed. There is little research performed on the cost aspect of material management on site in compliance with the schedule and the type of supply chain strategy. The process of delivering bulk Glass Reinforced Concrete (GRC) units based on a push-supply system to a congested site with limited storage space all the way to their storage and installation on site is studied in this paper. The resources' cost, deterioration cost, transportation-delay cost, and the corresponding space turnover rate associated with the process are also addressed. The aim of this paper is to incorporate lean thinking to develop, model, and simulate an optimized and dynamic site layout that allows for a smooth flow of materials to the site thus minimizing their accumulated logistics and handling costs using the simulation software EZStrobe. Results showed 16% reduction in the total cost and 15% in the total simulation time from the base model of the process under study by adopting a pull-based supply chain of GRC units and combining certain activities of the process.

Keywords

Dynamic site layout planning, lean construction, supply chain management, material handling cost, workflow

Files

Reference

Abou Dargham, S. , Assaf, S. , Faour, K. & Hamzeh, F. 2019. Optimizing Material-Related Costs Using Dynamic Site Layout and Supply Chain Planning , Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC) , 699-710. doi.org/10.24928/2019/0135

Download: BibTeX | RIS Format