TY - CONF TI - Optimization of Design Coordination Processes for a 7-Story Multifamily Building Using Virtual Design and Construction (VDC) AU - Merino Chocano, Alvaro Enrique AU - Fernández Bustamante, Diego Alfredo AU - Del Savio, Alexandre Almeida AD - Student, Civil Engineering Department, Universidad de Lima, Lima, Peru, 20182907@aloe.ulima.edu.pe, https://orcid.org/0009-0001-2496-8900 AD - Student, Civil Engineering Department, Universidad de Lima, Lima, Peru, 20180688@aloe.ulima.edu.pe, https://orcid.org/0009-0001-4392-8111 AD - Full Professor, Civil Engineering Department, Universidad de Lima, Lima, Peru, delsavio@gmail.com, https://orcid.org/0000-0002-6067-6606 ED - Costa, Dayana Bastos ED - Drevland, Frode ED - Florez-Perez, Laura PY - 2024 DA - 2024/07/01 T2 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) C3 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) CY - Auckland, New Zealand SP - 36 EP - 47 DO - 10.24928/2024/0125 SN - 2789-0015 (ISSN) AB - Traditional construction and property companies often find themselves bound by conventional project management and design techniques, which can lead to delays during the design phase. This situation needs to be avoided. This study presents a process optimization for the design stage of multifamily buildings using Virtual Design Construction (VDC) - a collaborative project management approach. Focused on a case study involving two residential buildings developed by the same property company in Lima, Peru, this research commences with a comprehensive analysis of the existing design processes from the projects. By pinpointing key sources of variability and streamlining the design flow, the proposed VDC implementation aims to enhance compliance with project timelines and the approval of design drawings. The optimized process yielded tangible results, significantly reducing design time, completing tasks ahead of the scheduled deadline, and improving the delivery of technical files by 25%. These outcomes underscore the benefits of this optimized process, including enhanced project efficiency and improved design quality, thereby making a compelling case for applying VDC in similar construction projects by property companies. KW - VDC KW - BIM KW - collaboration KW - concurrent engineering KW - process optimization. L1 - https://www.iglc.net/papers/details/2196/pdf UR - https://www.iglc.net/papers/details/2196 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -