TY - CONF TI - Investigation of the Supply Chain of Mass Timber Systems AU - Coelho, Rafael V. AU - Anderson, Aaron K. AU - Tommelein, Iris D. AD - PhD Candidate, Civil and Envir. Eng. Dept. and Project Production Systems Laboratory (P2SL), Univ. of California, Berkeley, CA, USA, rvcoelho@berkeley.edu, orcid.org/0000-0003-3298-3622 AD - Director of Innovation, Swinerton Inc., San Diego, CA, USA, aaron.anderson@swinerton.com, orcid.org/0000- 0003-2307-8516 AD - Distinguished Professor, Civil and Envir. Eng. Dept., Director, Project Production Systems Laboratory (P2SL), University of California, Berkeley, CA, USA, tommelein@berkeley.edu, orcid.org/0000-0002-9941-6596 PY - 2023 DA - 2023/06/26 T2 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) C3 - Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31) CY - Lille, France SP - 824 EP - 835 DO - 10.24928/2023/0254 SN - 2789-0015 (ISSN) AB - How well production systems and their supply chains are designed, configured, and managed affects the delivery of construction projects. Industrialized Construction (IC) and mass timber present a shift from traditional project delivery: they are reshaping existing supply chains and creating new ones within the construction industry. The rapidly increasing number of mass timber projects in North America and the emergence of mass timber supply chains bring the need to study and seek ways to design and improve the production systems that deliver customer value by means of such projects. Accordingly, this paper presents an exploratory case study that describes the characteristics of the mass timber supply chain in North America and the major steps in the process of designing and delivering a mass timber structural system for a multi-story residential building. In addition, we present a list of recommendations for designing and delivering mass timber systems. KW - Mass timber KW - supply chain management KW - industrialized construction KW - off-site construction KW - production system design. L1 - https://www.iglc.net/papers/details/2181/pdf UR - https://www.iglc.net/papers/details/2181 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -