TY - CONF TI - Takt Planning Effectiveness Into One Billion Dollars Projects AU - Fish, Mohamed Abou El AU - Salhab, Diana AU - Urizar, Mark AU - Shoeb, Mohammed AU - Neeraganti, Thirupal AU - Majed, Ali AD - Lean Construction Manager, KEO International, Doha, Qatar, mohamed.elfish@keoic.com AD - 2 Ph.D. student, Hole School of Construction Engineering, University of Alberta, Edmonton, Canada, salhab@ualberta.ca, orcid.org/0000-0003-0307-6193 AD - Co-owner, AAAX architecture, Brunswick East, Victoria, Australia, aaaxaus@gmail.com AD - Lean Lead, TriConstruct, Doha, Qatar, shoeb.m@triconstruct.com AD - Lean Lead, Darwish Engineering, Doha, Qatar, thirupalappa.neeraganti@boomconstruction.net AD - Lean Lead, TriConstruct, Doha, Qatar, ali.m@triconstruct.com PY - 2022 DA - 2022/07/27 T2 - Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC) C3 - Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC) CY - Edmonton, Canada SP - 13 EP - 24 DO - 10.24928/2022/0102 SN - 2309-0979 (ISSN) AB - Takt Planning (TP) is a prominent Lean tool that is gaining wide applicability on construction projects; it helps assess project progress status from the beginning of a project until the end. TP techniques pinpoint the weaknesses in a project’s scope of work and assist in identifying appropriate ways to integrate resources into any given project. The approach has been thoroughly studied in building projects but not on infrastructure ones, and little empirical results have been reported. Hence, this paper presents results from a case study of applying TP in mega infrastructure projects in Qatar. The paper showcases issues faced by teams during the execution of work, their TP approach to remedy the situation, their approach for integrating TP into the existing system, and the corresponding outcomes. Results show that adoption of TP helped the construction team to properly control, organize, and place resources into projects to achieve desired goals. This study is an accurate example of how TP technique can resolve project problems and provide a clear ‘X-ray’ to scan large projects. KW - Takt Planning KW - Infrastructure Projects KW - Lean tools L1 - https://www.iglc.net/papers/details/1941/pdf UR - https://www.iglc.net/papers/details/1941 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -