TY - CONF TI - Case Study - Overhead Costs Analysis AU - Kim, Yong-Woo AU - Ballard, Glenn AD - Ph. D. Candidate at University of California at Berkeley, ywkim@uclink4.berkeley.edu AD - Research Director at Lean Construction Institute (LCI) and Associate Adjunct Professor at University of California at Berkeley, gballard@leanconstruction.org ED - Formoso, Carlos T. ED - Ballard, Glenn PY - 2002 DA - 2002/08/06 T2 - 10th Annual Conference of the International Group for Lean Construction C3 - 10th Annual Conference of the International Group for Lean Construction CY - Gramado, Brazil AB - Construction projects become complicated and fragmented so that many specialty contractors are involved. In such changed environments, a general contractor’s overhead costs are increasing comparable to direct costs. In addition to an increase of volume, activities consisting of overhead costs play an important role in coordinating different participants who include different specialty contractors and client. This paper reviews traditional overhead control and critiques problems thereof through literature review, interviews with professionals, and data collection. It proposes a new overhead cost control method, called profit-point analysis (PPA) applying activitybased costing (ABC). It is followed by a case study presented to exemplify the new method. KW - Construction overhead costs KW - activity-based costing (ABC) KW - profit point analysis (PPA) KW - nurturing relationship L1 - https://www.iglc.net/papers/details/194/pdf UR - https://www.iglc.net/papers/details/194 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -