TY - CONF TI - Experiences From the Use of BIM-Stations AU - Murvold, Vegar AU - Vestermo, Aleksander AU - Svalestuen, Fredrik AU - Lohne, Jardar AU - Lædre, Ola AD - M.Sc., Dept. of Civil and Transport Engineering, Norwegian University of Science and Technology (NTNU), Trondheim, Norway, +47 918 13 994, vegarmu@stud.ntnu.no AD - M.Sc., Dept. of Civil and Transport Engineering, Norwegian University of Science and Technology (NTNU), Trondheim, Norway, +47 928 41 916, aleksave@stud.ntnu.no AD - Ph.D. Candidate, Dept. of Civil and Transport Engineering, Norwegian University of Science and Technology (NTNU)/Veidekke Entreprenør AS, Norway, +47 986 73 172, fredrik.svalestuen@ntnu.no AD - Research scientist, dr. art., Department of Civil and Transport Engineering, Norwegian University of Science and Technology (NTNU), Trondheim, Norway AD - Associate Professor, Dept. of Civil and Transport Engineering, NTNU Norwegian University of Science and Technology, Trondheim, Norway, +47 911 89 938, ola.ladre@ntnu.no PY - 2016 DA - 2016/07/20 T2 - 24th Annual Conference of the International Group for Lean Construction C3 - 24th Annual Conference of the International Group for Lean Construction CY - Boston, Massachusetts, USA SN - 2309-0979 (ISSN) AB - BIM has gone from being a design-tool to being an important part of the production process. BIM-stations make 3D-models available for everyone, including all the workers on-site. This paper 1) reports on experiences from the use of BIM-stations on site and 2) suggests certain improvements to increase the benefit of the BIM-stations. Following a case study approach, it examines the production phase of a building project in Norway. Initially, a survey among 50 workers on-site was carried out. Both carpenters, plumbers and electricians conducted the survey. This was followed by semi-structured in-depth interviews with six key actors. Among the interviewees was the project manager, the BIM-coordinator on the project, and managers from the project owner’s organization. The research revealed that workers experience saving time with BIM-stations. They report higher productivity due to having the necessary information available at all time. The highest productivity increase appeared for the MEP workers. This study was carried out over a relatively short period, with limited access to measurements of cost and savings from the use of BIM-stations. Nonetheless, the findings are still very positive and can guide future implementation of BIM-stations in the production phase. KW - Building information modelling KW - BIM on site KW - BIM-stations KW - visualization KW - on-site communication L1 - https://www.iglc.net/papers/details/1290/pdf UR - https://www.iglc.net/papers/details/1290 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -