TY - CONF TI - WIP Design in a Construction Project Using Takt Time Planning AU - Faloughi, Mazen AU - Linnik, Meeli AU - Murphy, Dan AU - Frandson, Adam G. AD - Graduate Student, Civil and Envir. Engrg. Dep.t, Univ. of California, Berkeley, CA, USA, mazen@berkeley.edu AD - Production Engineer, The Boldt Company, The Replacement Hospital at St. Luke’s Campus Project, 555 San Jose Ave, San Francisco, CA, USA, meeli.linnik@boldt.com AD - Production Manager, The Boldt Company, The Replacement Hospital at St. Luke’s Campus Project, 555 San Jose Ave, San Francisco, CA, USA, dan.murphy@boldt.com AD - PhD Student, Civil and Envir. Engrg. Dept., Univ. of California, Berkeley, CA, USA, afrandson@berkeley.edu ED - Seppänen, Olli ED - González, Vicente A. ED - Arroyo, Paz PY - 2015 DA - 2015/07/29 T2 - 23rd Annual Conference of the International Group for Lean Construction C3 - 23rd Annual Conference of the International Group for Lean Construction CY - Perth, Australia SP - 163 EP - 172 SN - 2309-0979 (ISSN) AB - Work in process (WIP) is a well understood and used metric in the management of manufacturing processes. However, this is not the case when it comes to production planning in non-repetitive construction projects. Moreover, there are different understandings of WIP depending on the management personnel using it (financial managers vs. production planners for example). The aim of this paper is to study how WIP can be defined in the context of a construction project so that it can easily be identified, visualized, and managed without having to resort to simulation models or advanced software tools. The authors present a case study where Takt time thinking is used to identify and handle different types of WIP and improve construction workflow. The challenge is to minimize both ‘work waiting on workers’ and ‘workers waiting on work’ by determining suitable work area sizes, and having an adequate work backlog. The case study shows how in some cases, areas are separated and sized so that WIP between tasks can be reduced, and in others KW - Takt time planning KW - WIP KW - production system design. L1 - https://www.iglc.net/papers/details/1240/pdf UR - https://www.iglc.net/papers/details/1240 DB - IGLC.net LA - English N1 - Export date: 04 October 2026 ER -