@inproceedings{Gonalves2026_2524, author = {Gonçalves, Bruna Milán and Corrêa, Fabiano Rogério}, editor = {Hamzeh, Farook and Poshdar, Mani and Garcia-Lopez,, Nelly P. and Gan, Vincent}, title = {Systematising the creation of Line of Balance: an automated tool for multi-storey building}, booktitle = {Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34)}, year = {2026}, pages = {1654--1665}, address = {Singapore, Singapore}, issn = {2789-0015}, doi = {10.24928/2026/0226}, url = {https://www.iglc.net/papers/details/2524}, abstract = {Planning in multi-storey buildings is often constrained by manual processes and tacit knowledge, which hinders the systematic application of Lean principles. This paper presents the formalisation of a structured method based on three deterministic spatio-temporal rules—stable rhythm, vertical continuity, and non-crossing—and its instantiation in a computational artefact developed in Excel/VBA under the Design Science Research approach. The automation reduced the processing effort of an otherwise exhaustive manual procedure to a few seconds, allowing the agile exploration of multiple rhythm scenarios. Its application to a real residential project provided a real-data environment for the artefact instantiation, supporting the identification of a schedule recovery potential of 21%, assessed significantly faster and more consistently than through conventional planning approaches. The results demonstrate that the integration between the method and its technological instantiation enhances data-driven decision-making, strengthens operational predictability, and supports the transition towards a more flow-oriented planning system.}, keywords = {Lean construction, location-based management, Line of Balance, scenario simulation, BIM.}, }