@inproceedings{Arsianto2026_2488, author = {Arsianto, Yovi}, editor = {Hamzeh, Farook and Poshdar, Mani and Garcia-Lopez,, Nelly P. and Gan, Vincent}, title = {Beyond the jobsite: adapting make-ready logic to managerial decision-making in construction}, booktitle = {Proceedings of the 34th Annual Conference of the International Group for Lean Construction (IGLC 34)}, year = {2026}, pages = {1064--1075}, address = {Singapore, Singapore}, issn = {2789-0015}, doi = {10.24928/2026/0179}, url = {https://www.iglc.net/papers/details/2488}, abstract = {Despite extensive advances in Lean Construction, particularly through the Last PlannerĀ® System (LPS), limited attention has been given to structuring managerial meetings as production systems for decision-making. As a result, managerial processes remain prone to decision latency, information variability, and unreliable commitments. This study addresses this gap by developing the Make-Ready Meeting (MRM) framework, which extends Make-Ready Planning logic from operational workflows to managerial decision contexts. Using a conceptual research approach supported by a narrative literature review, the framework integrates Lean Office (LO), Lean Governance (LG), and LPS into a unified model emphasizing information readiness, constraint management, and commitment reliability. A key contribution is the introduction of a filter gate mechanism that operationalizes shielding at the managerial level by screening decision inputs prior to execution. The framework repositions meetings as commitment-production systems and shifts cognitive effort upstream. This cross-level theoretical extension contributes to Lean theory by linking decision-making reliability with workflow performance, offering a pathway to reduce decision latency in construction projects.}, keywords = {Last PlannerĀ® System, lean construction, make-ready planning, continuous improvement, commitment.}, }