TY - CONF TI - Method for Designing Macro and Micro Layouts for Storage and Temporary Facilities in Residential Projects Based on Takt Planning C1 - Osaka and Kyoto, Japan C3 - Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (IGLC 33) SP - 341 EP - 352 PY - 2025 DO - 10.24928/2025/0237 AU - Reck, Raquel H. AU - Fireman, Marcus C. T. AD - Lean Consultant at Climb Consulting Group and PhD Candidate at NORIE/UFRGS, Porto Alegre, RS, Brazil, +55 51 998711561, raquel@climbgroup.com.br, orcid.org/0000-0003-1928-3461. AD - Founding Partner at Climb Consulting Group and PhD Candidate at NORIE/UFRGS, Porto Alegre, RS, Brazil, marcus@climbgroup.com.br, orcid.org/0000-0001-5843-4715. ED - Seppänen, Olli ED - Koskela, Lauri ED - Murata , Koichi AB - Logistics is considered a key element for the successful adoption of takt planning. However, there are few practical studies that demonstrate how the issue of material storage should be approached. This topic becomes more relevant when considering that takt planning, as well as other lean-based methodologies, has a greater focus on reducing inventories. Therefore, this paper presents a method for designing macro and micro storage layouts in residential construction projects to support takt planning implementation. Using the design science research methodology, the study relies on the application of two-dimensional and three-dimensional cells to represent storage areas, supported by estimated data from a case study and secondary data of similar projects. The primary goal of the method is to optimize space usage in alignment with takt demands, thereby reducing waste and promoting production efficiency. The results highlight the method's accuracy in determining the occupancy rates of different storage areas for the various materials required to meet the project’s takt demand. As recommendations for future research, the study emphasizes the integration of digital tools, such as BIM, to facilitate spatial visualization and the exploration of generic algorithms for layout optimization. KW - Takt Planning KW - WorkFlow KW - Construction logistics KW - Residential Projects. PB - T2 - Proceedings of the 33rd Annual Conference of the International Group for Lean Construction (IGLC 33) DA - 2025/06/02 CY - Osaka and Kyoto, Japan L1 - http://iglc.net/Papers/Details/2397/pdf L2 - http://iglc.net/Papers/Details/2397 N1 - Export Date: 28 December 2025 DB - IGLC.net DP - IGLC LA - English ER -