TY - CONF TI - Quantitative Indicators in Takt Production Control: An Empirical Analysis C1 - Auckland, New Zealand C3 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) SP - 283 EP - 293 PY - 2024 DO - 10.24928/2024/0107 AU - Riekki, Jaakko AU - Seppänen, Olli AU - Lehtovaara, Joonas AU - Peltokorpi, Antti AD - Doctoral Candidate, Department of Civil Engineering, Aalto University, Finland, jaakko.riekki@aalto.fi, orcid.org/0000-0002-0306-2165 AD - Associate Professor, Department of Civil Engineering, Aalto University, Finland, olli.seppanen@aalto.fi, orcid.org/0000-0002-2008-5924 AD - Development Manager, A-insinöörit Construction Management joonas.lehtovaara@ains.fi, orcid.org/0000-0002-4761-3811 AD - Assistant Professor, Department of Civil Engineering, Aalto University, Finland, antti.peltokorpi@aalto.fi:, orcid.org/0000-0002-7939-6612 AB - Takt production has improved lead times and stability of lean construction projects. There are several studies about takt planning but research on takt control is scant. Although some quantitative indicators have been proposed for assessing how well sites are able to follow the plan, there are no studies which have used these indicators on real projects on a work package and daily level of detail. This paper investigates through a case example how previously proposed quantitative indicators of takt control work on a detailed level. We also discuss how the indicators can be interpreted for understanding plan adherence, control actions, and improvement opportunities. Studying takt control aims to learn why and how production deviates from the plan and how management should act to get the intended production realized. Quantitative analysis with progress data and indicators calculated from them can be used to measure deviation from the plan and the performance of the production system. This paper shows how takt control can be analyzed with flow efficiency and punctuality indicators. Indicators reveal improvement opportunities in outlier trades and takt areas in flow efficiency, the relationship of product and operations flow and go-back work areas. KW - Takt production KW - production control KW - quantitative indicators KW - progress tracking KW - improvement PB - T2 - Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32) DA - 2024/07/01 CY - Auckland, New Zealand L1 - http://iglc.net/Papers/Details/2283/pdf L2 - http://iglc.net/Papers/Details/2283 N1 - Export Date: 13 March 2025 DB - IGLC.net DP - IGLC LA - English ER -